Just another Minnesota Mom blog.

Behind schedule.

Posted: December 1st, 2010 | Author: | Filed under: Misc. | Tags: Dr. Sears | 3 Comments »

We have the boys on the Dr. Sears alternative vaccination schedule.  I didn’t want them getting 4 shots at every appointment and didn’t mind going in every other month for a lab visit- we were usually in and out in no time and with Super Nanny along it was never a huge deal.  We never missed an appointment, every vaccination is up to date except for the MMR which we are still putting off until 3.

I wanted to keep Judah on the same schedule but I’ve already messed it up.  I cancelled his lab appointment the same week I cancelled the boys 2 year appointments and now we’ve got the 4 month appointment coming up and I am feeling like we’re just going to be playing catch up from here on out.  This time of year is pretty crazy around here.

So, what now?  Do I make the lab appointment as soon as possible and then schedule his 4 month for the end of the month?  We’ll be 2-3 weeks behind that way.  What’s more important?  Getting weighed and measured at the right intervals?  Why do I have to be so stubborn about this?  Why can’t I just get my kids vaccinated according to the CDC schedule?

Related Posts:

  • No Related Posts

3 Comments on “Behind schedule.”

  1. 1 julie said at 8:44 pm on December 1st, 2010:

    Try to catch up ASAP, otherwise you will be playing catch up for a long time. Let me know what I can help you with.


  2. 2 themamabeth said at 11:32 pm on December 1st, 2010:

    We decided to do Lucy on the Sears schedule, and even though Adeline started out on the CDC one, we're switching her to Sears. It involves long, complicated hand-written lists. I don't think it'll be that big of a deal to be 2-3 weeks behind. We're juggling this month, Lucy is due for her round, and I just don't know when I'll be able to get in to do it. Bah. Oh, and I don't think the weighing/ measuring thing has to be on that specific of a schedule, A's ped didn't seem to care about us being exact with timeframes, AND she was on the smallish side.

  3. 3 Ebook PDF said at 2:38 pm on April 12th, 2011:

    I just signed up to your rss feed! Will you post more on the subject? http://www.apnatorrents.com/download-mercy-blade-jane-yellowrock-book-3-pdf-torrent.html

Leave a Reply

  • CommentLuv badge